რუსთავის მე-6 საჯარო სკოლის რეაბილიტაციაProject name:Facility of fruit processing and Churchkhela producing Employer:LLC “Badagi +” Description:The facility was built in Tsnori aligned to LLC “Badagi plus” standards which is equipped with facilities which can process fruit and churchkhela. The facility includes two main buildings and other buildings. The total area is 173/.32 m2. The project successfully ended in 2020 and took only one year which is a result of professional and coordinated works.
The plant is equipped with innovative technologies, marking a new stage in the production of dried fruits and tklapi in Georgia. It produces approximately 11,000 kg of dried fruits and tklapi annually. All fire safety measures were taken into account during construction, fully complying with current legislation and ensuring the safety of both employees and the production process.
In addition, the project included the construction of a dedicated building for churchkhela production, enhancing the facility’s diversity and uniqueness. This step reflects our team’s commitment to creating an innovative and high-quality environment.
The project was carried out by using high-quality materials and with exceptional attention to detail, demonstrating our team’s professionalism and sense of responsibility. We take pride in building modern, reliable, and innovative facilities that play a vital role in the development of Georgia’s agriculture sector. Construction phase:completedLocation:Tsnori
LLC Badagi And Badagi+
რუსთავის მე-6 საჯარო სკოლის რეაბილიტაციაProject name:Facility of fruit processing and Churchkhela producing Employer:LLC “Badagi +” Description:The facility was built in Tsnori aligned to LLC “Badagi plus” standards which is equipped with facilities which can process fruit and churchkhela. The facility includes two main buildings and other buildings. The total area is 173/.32 m2. The project successfully ended in 2020 and took only one year which is a result of professional and coordinated works.
The plant is equipped with innovative technologies, marking a new stage in the production of dried fruits and tklapi in Georgia. It produces approximately 11,000 kg of dried fruits and tklapi annually. All fire safety measures were taken into account during construction, fully complying with current legislation and ensuring the safety of both employees and the production process.
In addition, the project included the construction of a dedicated building for churchkhela production, enhancing the facility’s diversity and uniqueness. This step reflects our team’s commitment to creating an innovative and high-quality environment.
The project was carried out by using high-quality materials and with exceptional attention to detail, demonstrating our team’s professionalism and sense of responsibility. We take pride in building modern, reliable, and innovative facilities that play a vital role in the development of Georgia’s agriculture sector. Construction phase:completedLocation:Tsnori
RustaviPublic School N21
რუსთავის მე-6 საჯარო სკოლის რეაბილიტაციაProject name:Rehabilitation of Rustavi Public School №21 Employer:Municipal Development Fund of Georgia Description:GBG successfully finished rehabilitation of a public school which is dedicated to 1660 pupils and has total area of 6640 m2. The project started in 2023 year and finished in 2025.
The works included a fully renovation of the school and creating functional spaces aligned to FIBA standards – an indoor basketball hall, an outdoor football field and a modern room which provides heating, cold and hot water, and a fire safety reservoir.
Special attention was given to using eco-friendly structures and designing effective classrooms to provide a healthy and trustworthy environment.The school includes a lift for disabled peope, ensuring complete accessibility.
The schoolyard was renovated and greened with modern standards to give teachers and children environment where they can improve.
GBG is proud that the project was completed using high-quality materials and in accordance with modern standards, fully complying with current legislation. The school is fully adapted for people with disabilities and meets all necessary fire safety requirements, creating a secure and reliable environment.
We are honored to have finished this historical school and equipped spaces with modern standards to have teachers and children best conditions to learn and improve. Construction phase:completedLocation:Rustavi, 3 Meskhishvili II Passage
RustaviPublic School N21
რუსთავის მე-6 საჯარო სკოლის რეაბილიტაციაProject name:Rehabilitation of Rustavi Public School №21 Employer:Municipal Development Fund of Georgia Description:GBG successfully finished rehabilitation of a public school which is dedicated to 1660 pupils and has total area of 6640 m2. The project started in 2023 year and finished in 2025.
The works included a fully renovation of the school and creating functional spaces aligned to FIBA standards – an indoor basketball hall, an outdoor football field and a modern room which provides heating, cold and hot water, and a fire safety reservoir.
Special attention was given to using eco-friendly structures and designing effective classrooms to provide a healthy and trustworthy environment.The school includes a lift for disabled peope, ensuring complete accessibility.
The schoolyard was renovated and greened with modern standards to give teachers and children environment where they can improve.
GBG is proud that the project was completed using high-quality materials and in accordance with modern standards, fully complying with current legislation. The school is fully adapted for people with disabilities and meets all necessary fire safety requirements, creating a secure and reliable environment.
We are honored to have finished this historical school and equipped spaces with modern standards to have teachers and children best conditions to learn and improve. Construction phase:completedLocation:Rustavi, 3 Meskhishvili II Passage
Amkhanagoba Dighomi 2007 Construction Of Multi-Apartment Residential Building
რუსთავის მე-6 საჯარო სკოლის რეაბილიტაციაProject name:Amkhanagoba „Dighomi 2007” – construction multi-apartment complex Employer:Amkhanagoba “Dighomi 2007” Description:GBG successfully completed the construction of a multi-apartment residential complex located in Tbilisi. The project started in 2019 and was finished in 2022.
The project consists of 17-story building that has total area 25,389,4 M2 including 14,442.4 m² of residential space and 2,407.7 m² of commercial space. Four lift were installed in building which ensures safe transportation of residents.
Although the project faced several challenges and was stopped , yet GBG’s involvement helped to carry out and finish. Our team gives special attention for every detail – used high-quality , eco-friendly and energy-efficient materials that provides healthy environment and reduces cost of operating.
Building is fully adapted for people with disabilities and meets all requirements of fire safety system in accordance with Georgian law.
GBG is proud for completing this building with responsibility and professionalism which proved our reliability and expertise in construction field. Construction phase:completed
Location:Tbilisi , Dighomi.
Construction of
Multi-Apartment Building In Rustavi
რუსთავის მე-6 საჯარო სკოლის რეაბილიტაციაProject name:Multi-Apartment Residential Building, 6 Gogebashvili St. Rustavi Employer:GBG development Description:GBG built a 5-story residential building in Rustavi with a total area of 4,695 m². The project consists of apartments, commercial spaces, and an underground parking area for 35 cars (2 spaces for people with disabilities) and bicycle parking.
The residential building has five floors, and the parking area located at -2.80 elevation is designed for 35 cars, including 2 spaces specifically designated for people with disabilities. The parking area also includes a bicycle parking zone. The building is surrounded by a landscaped yard featuring green spaces, recreational areas, and children’s playgrounds — this project is one of the first examples in the city where park infrastructure is integrated with residential space.
The building is surrounded by a green yard with benches and a playground, making it one of the first projects in Rustavi to combine park space with residential living.
High-quality, eco-friendly materials were used. The building is fully accessible for people with disabilities and meets all fire safety standards according to Georgian law.
GBG is proud to have completed this modern and comfortable housing project, contributing to the city’s development. Construction phase:completed
Location:6 Gogebashvili Street, Rustavi
Construction of
Multi-Apartment Building In Rustavi
რუსთავის მე-6 საჯარო სკოლის რეაბილიტაციაProject name:Multi-Apartment Residential Building, 6 Gogebashvili St. Rustavi Employer:GBG development Description:GBG built a 5-story residential building in Rustavi with a total area of 4,695 m². The project consists of apartments, commercial spaces, and an underground parking area for 35 cars (2 spaces for people with disabilities) and bicycle parking.
The residential building has five floors, and the parking area located at -2.80 elevation is designed for 35 cars, including 2 spaces specifically designated for people with disabilities. The parking area also includes a bicycle parking zone. The building is surrounded by a landscaped yard featuring green spaces, recreational areas, and children’s playgrounds — this project is one of the first examples in the city where park infrastructure is integrated with residential space.
The building is surrounded by a green yard with benches and a playground, making it one of the first projects in Rustavi to combine park space with residential living.
High-quality, eco-friendly materials were used. The building is fully accessible for people with disabilities and meets all fire safety standards according to Georgian law.
GBG is proud to have completed this modern and comfortable housing project, contributing to the city’s development. Construction phase:completed
Location:6 Gogebashvili Street, Rustavi
College Modusi Construction And Project Services For A Vocational Education Facility In Rustavi
რუსთავის მე-6 საჯარო სკოლის რეაბილიტაციაProject name:college modusi - project of vocational educational facility in rustavi. Employer:college modusi Description:GBG successfully completed the construction of the new campus for College “Modusi” in Rustavi. The project began in 2021 and was completed in 2023. The campus covers 2,200 m² and meets all architectural and legal standards set by Rustavi City Hall.
Campus was built by eco-friendly materials and modern technologies which ensures its durability , comfort and energy-efficient. The special attention was given to protection of safety standards and ensuring environment that is adaptable to people with disability.
During project was installed panels, lighting and ventilation systems, ramps, and an elevator — making the building accessible for all students. Energy-efficient solutions were also implemented to improve sustainability and comfort.
GBG fully completed its obligations and carried out project with responsibility and professionalism. We are proud to support education and help build a better future for vocational students. Construction phase:completed
Location:Rustavi , Kvemo kartli region.
Tbilisi Kindergarden Management Agency Construction Of New Kindergarden
რუსთავის მე-6 საჯარო სკოლის რეაბილიტაციაProject name:Tbilisi Kindergarden N8 — Navtlughi Street Employer:Tbilisi Kindergarden Management Agency Description:GBG successfully completed the construction of a new kindergarden on Navtlughi Street No. 8, designed for 260 children. The project started in 2023 and was completed in 2024. The two-story building has a total area of 1,558 m², while the entire site covers 3,427 m².
The kindergarden includes playrooms, sleeping rooms, fully accessible spaces for children with disabilities, a medical unit, kitchen and dining area, administrative zone, and a multipurpose hall. The outdoor area was landscaped with new greenery and designed to provide a safe and pleasant environment for children.
We paid careful attention to every detail to ensure the project is eco-friendly, energy-efficient, and meets modern standards. All safety norms — including fire safety — were strictly followed in full compliance with Georgian law.
GBG is proud to have carried out this project with professionalism and care, creating a safe, modern, and well-equipped space for future generations. Construction phase:Construction work is currently underway. The project is scheduled to be completed by the end of 2025.Location:Region of Kvemo Kartli , Rustavi.
Tbilisi Kindergarden Management Agency Construction Of New Kindergarden
რუსთავის მე-6 საჯარო სკოლის რეაბილიტაციაProject name:Tbilisi Kindergarden N8 — Navtlughi Street Employer:Tbilisi Kindergarden Management Agency Description:GBG successfully completed the construction of a new kindergarden on Navtlughi Street No. 8, designed for 260 children. The project started in 2023 and was completed in 2024. The two-story building has a total area of 1,558 m², while the entire site covers 3,427 m².
The kindergarden includes playrooms, sleeping rooms, fully accessible spaces for children with disabilities, a medical unit, kitchen and dining area, administrative zone, and a multipurpose hall. The outdoor area was landscaped with new greenery and designed to provide a safe and pleasant environment for children.
We paid careful attention to every detail to ensure the project is eco-friendly, energy-efficient, and meets modern standards. All safety norms — including fire safety — were strictly followed in full compliance with Georgian law.
GBG is proud to have carried out this project with professionalism and care, creating a safe, modern, and well-equipped space for future generations. Construction phase:Construction work is currently underway. The project is scheduled to be completed by the end of 2025.Location:Region of Kvemo Kartli , Rustavi.
სოფლის მეურნეობის
Scientific Research Center Scientific-Research Center Of Agriculture – Experimental Facility For Grape And Agricultural Product Storage & Processing
რუსთავის მე-6 საჯარო სკოლის რეაბილიტაციაProject name:Scientific-Research Center of Agriculture – Experimental Facility for Grape and Agricultural Product Storage & Processing Employer:Scientific-Research Center of Agriculture Description:GBG successfully completed the construction of a 700 m² experimental research facility in the village of Jighaura, Mtskheta Municipality. The space is designed for the storage and processing of grapes, wine, and other agricultural products. The building consists of an open, multifunctional space equipped with refrigeration systems and specialized conditions to ensure high-quality storage and proper execution of scientific experiments.
Construction began in 2021 and was successfully completed within the same year. The project used high-quality materials and complied with all safety standards in accordance with Georgian legislation.
GBG is proud to have delivered this project with full responsibility and professionalism, once again demonstrating our team’s reliability in supporting the development of Georgia’s agricultural sector. Construction phase:completed
Location:village Jighaura , Mtskheta municipality.
Scientific-Research Center of Agriculture Scientific-Research Space For Viticulture And Grape Products
რუსთავის მე-6 საჯარო სკოლის რეაბილიტაციაProject name:Scientific-Research Center of Agriculture – Experimental Facility for Grape and Agricultural Product Storage & Processing Employer:Scientific-Research Center of Agriculture Description:GBG has successfully completed the construction of a two-story, 2,598 m² scientific-research facility in the village of Jighaura, Mtskheta, which also includes additional underground space. The building is intended for scientific research and development in viticulture and grape-derived products, combining traditional and modern approaches.
The project incorporates elements of traditional Georgian architecture — wooden balconies with railings and a tiled roof — which give the building a distinctive character. The atmosphere of the wine world is evoked by partially embedded qvevris within the interior space, while the theme of vineyards and grapes continues on the stained-glass window of the main façade.
As part of the project, a modern boiler system was installed to provide heating and hot water for the building. High-quality materials and advanced technologies were used throughout the construction process. The building is fully accessible for people with disabilities, and all fire safety measures have been implemented in accordance with current regulations.
GBG is proud to have delivered this project with full responsibility and professionalism, once again demonstrating our team’s reliability in supporting the development of Georgia’s agricultural sector. Construction phase:The project began in 2019 and will be completed in 2021.Location:village Jighaura , Mtskheta municipality.
Scientific-Research Center of Agriculture Scientific-Research Space For Viticulture And Grape Products
რუსთავის მე-6 საჯარო სკოლის რეაბილიტაციაProject name:Scientific-Research Center of Agriculture – Experimental Facility for Grape and Agricultural Product Storage & Processing Employer:Scientific-Research Center of Agriculture Description:GBG has successfully completed the construction of a two-story, 2,598 m² scientific-research facility in the village of Jighaura, Mtskheta, which also includes additional underground space. The building is intended for scientific research and development in viticulture and grape-derived products, combining traditional and modern approaches.
The project incorporates elements of traditional Georgian architecture — wooden balconies with railings and a tiled roof — which give the building a distinctive character. The atmosphere of the wine world is evoked by partially embedded qvevris within the interior space, while the theme of vineyards and grapes continues on the stained-glass window of the main façade.
As part of the project, a modern boiler system was installed to provide heating and hot water for the building. High-quality materials and advanced technologies were used throughout the construction process. The building is fully accessible for people with disabilities, and all fire safety measures have been implemented in accordance with current regulations.
GBG is proud to have delivered this project with full responsibility and professionalism, once again demonstrating our team’s reliability in supporting the development of Georgia’s agricultural sector. Construction phase:The project began in 2019 and will be completed in 2021.Location:village Jighaura , Mtskheta municipality.
Mtsketa Municipality Village Mukhrani – Construction Of Multi-Cunctional Sports Hall
რუსთავის მე-6 საჯარო სკოლის რეაბილიტაციაProject name:Mtsketa Municipality , village Mukhrani - Construction of multi-functional sports hall. Employer:Mtsketa municipality city hall Description:GBG successfully completed the construction of a multifunctional sports hall in the village of Mukhrani (Patara Kanda area), Mtskheta Municipality. The project began in 2021 and was completed in 2024. The building consists of three floors, with a total area of 1,341.9 m² and a total development area of 1,886.82 m².
The facility includes a specialized wrestling arena designed specifically for athletes, fully meeting the sport’s technical standards. High-quality, eco-friendly construction materials were used throughout the project, ensuring durability, energy efficiency, and compliance with modern building standards.
The building is fully adaptable for people with disability offering accessible infrastructure and unobstructed movement throughout the facility. All essential fire safety requirements were met in strict accordance with current Georgian legislation.
At GBG, we consider it both a great responsibility and an honor to support the development of such a vital infrastructure. We are proud to contribute to the promotion of a healthy lifestyle, regional development, and equal access for all. Construction phase:completed
Location:Village Mukhrani (territory of Patara Kanda), Mtskheta Municipality
Tbilisi N50 kindergarden
რუსთავის მე-6 საჯარო სკოლის რეაბილიტაციაProject name: Tbilisi N50 kindergarden Employer:“Tbilisi Kindergarten Management Agency” Description:The full construction and rehabilitation of Tbilisi Kindergarten No. 50 has been successfully completed. The new three-story kindergarten, located on Mshvidobis Street in Zahesi, has been designed and built in accordance with modern standards. The total area of the facility is 2,412.32 m², and it is fully adapted to meet all safety requirements and the needs of children.
The building features contemporary architecture, energy-efficient solutions, and high-quality, certified construction materials that ensure maximum safety for children. The infrastructure includes a sports hall, a music hall, comfortable dining areas, multifunctional educational spaces, and an outdoor playground.
The project incorporates accessibility standards for persons with disabilities, including ramps, wide corridors, and adapted areas. The facility is fully equipped with fire safety systems and complies with all regulations required by current legislation. Construction Status:Construction works were completed in the fall of 2025, and the facility has been fully handed over for operation.
Location:Tbilisi, Zahesi, 2 Mshvidobis Street.
Tbilisi N50 kindergarden
რუსთავის მე-6 საჯარო სკოლის რეაბილიტაციაProject name:Tbilisi N50 kindergarden Employer:“Tbilisi Kindergarten Management Agency” Description:The full construction and rehabilitation of Tbilisi Kindergarten No. 50 has been successfully completed. The new three-story kindergarten, located on Mshvidobis Street in Zahesi, has been designed and built in accordance with modern standards. The total area of the facility is 2,412.32 m², and it is fully adapted to meet all safety requirements and the needs of children.
The building features contemporary architecture, energy-efficient solutions, and high-quality, certified construction materials that ensure maximum safety for children. The infrastructure includes a sports hall, a music hall, comfortable dining areas, multifunctional educational spaces, and an outdoor playground.
The project incorporates accessibility standards for persons with disabilities, including ramps, wide corridors, and adapted areas. The facility is fully equipped with fire safety systems and complies with all regulations required by current legislation.
GBG is proud to have delivered this project with full responsibility and professionalism, once again demonstrating our team’s reliability in supporting the development of Georgia’s agricultural sector. Construction Status:Construction works were completed in the fall of 2025, and the facility has been fully handed over for operation.Location:Tbilisi, Zahesi, 2 Mshvidobis Street.
Natakhtari–Lekhura Natakhtari–Lekhura Trunk Gas Pipeline
რუსთავის მე-6 საჯარო სკოლის რეაბილიტაციაProject name:Natakhtari–Lekhura Trunk Gas Pipeline Employer:Georgian Oil and Gas Corporation Contractor:Rapid LLC (a subsidiary of GBB) Project OverviewThe project involved the construction of the Natakhtari–Lekhura DN700 trunk gas
pipeline, implemented across two distinct sections:
• Ksani–Lekhura Section – 14 km
• Natakhtari–Ksani Section – 17.5 km
The works were executed in two phases:
• Phase I: 2018 – 2020
• Phase II: 2021 – 2024 Scope of Works:
Rapid LLC executed a full-cycle pipeline construction scope, covering all major civil,
mechanical, and pre-commissioning activities:
1. Right-of-Way (RoW) Preparation
• Route surveying, staking, and alignment;
• Stripping, handling, and stockpiling of topsoil;
• Construction of temporary and permanent access roads.
2. Pipe Handling and Welding
• Transportation, unloading, and stringing of pipes along the route;
• Field welding, non-destructive testing (NDT), and joint coating;
• Assembly and continuous welding of pipeline strings.
3. Trenching and Pipeline Installation
• Excavation of trenches within the RoW;
• Lowering-in of welded pipeline strings;
• Backfilling, compaction, and reinstatement of the corridor.
4. Cathodic Protection System
• Installation of cathodic protection to mitigate corrosion caused by stray electrical
currents;
• Ensuring the long-term integrity and durability of the pipeline.
5. Internal Cleaning and Gauging
• Mechanical cleaning and gauging using pneumatic pigs to verify pipeline geometry
and internal condition.
6. Pressure Testing and Integrity Verification
• Hydrostatic and/or pneumatic pressure testing;
• Leak detection and verification of pipeline tightness in accordance with applicable
standards.
7. Construction of Associated Facilities
• Construction of underground gas distribution and control facilities along the pipeline
route.
8. Drying and Pre-Commissioning
• Cleaning using polyurethane foam pigs;
• Air drying to achieve the required internal dryness levels;
• Final preparation for commissioning.
9. Commissioning Readiness
• Execution of all pre-commissioning and commissioning readiness procedures to
ensure the pipeline is fully prepared for safe and reliable operation.
Tbilisi N6 Kindergarden
რუსთავის მე-6 საჯარო სკოლის რეაბილიტაციაProject name:Tbilisi N6 kindergarden Employer:LLC “Tbilisi Agency for Management of Preschool Educational Institutions” Description:Tbilisi’s N6 kindergarden is three-story educational institute which is being built in D.Aghmashenebeli avenue near Boris paichadze stadium. Its total area is 4.266,95 m2 and it is designed to provide a safe and comfortable environment for children. The project consists of veranda parts (976.3 m2) that makes extra space for different activities. Construction is carried out by using high-quality equipments that were specially chosen to provide a healthy environment for children. The building is equipped with ramps for people with disabilities and modern. Construction phase:Construction work is currently underway. The project is scheduled to be completed by the end of 2025.
Location:Village Igoeti , Kaspi municipality.
Tbilisi N6 Kindergarden
რუსთავის მე-6 საჯარო სკოლის რეაბილიტაციაProject name:Tbilisi N6 kindergarden Employer:LLC “Tbilisi Agency for Management of Preschool Educational Institutions” Description:Tbilisi’s N6 kindergarden is three-story educational institute which is being built in D.Aghmashenebeli avenue near Boris paichadze stadium. Its total area is 4.266,95 m2 and it is designed to provide a safe and comfortable environment for children. The project consists of veranda parts (976.3 m2) that makes extra space for different activities. Construction is carried out by using high-quality equipments that were specially chosen to provide a healthy environment for children. The building is equipped with ramps for people with disabilities and modern. Construction phase:Construction work is currently underway. The project is scheduled to be completed by the end of 2025.
Location:Village Igoeti , Kaspi municipality.
Rustavi School N6
რუსთავის მე-6 საჯარო სკოლის რეაბილიტაციაProject name:Rehabilitation of Rustavi public school N6 Employer:The municipal fond of Georgia Description:Rustavi public school N6 is a comprehensive rehabilitation project in Kvemo kartli region , Rustavi. The school is dedicated to 800 pupil and employed 45 teacher. The total building area is 3,587.14 m2 , while green spaces have total area 8,986.96 m2. The project’s mission is to fully renovate the school aligned to modern standards including classrooms , multifunctional halls , sports grounds and dining places. In addition , electrical and mechanical systems will be upgraded and heating and fire safety systems will be added , outdoor areas will also be improved. The building will be fully adapted for disabled people with ramps , elevators and all necessary infrastructure. The project is being carried out by full compliance with current legislation , ensuring safe , comfortable and energy-efficient environment for both teachers and pupils. Our team is carrying out the project with high responsibility and professionalism.
The construction phase : Construction works actively going now. The project is scheduled to be completed in end of the 2025 year. Construction phase:Construction work is currently underway. The project is scheduled to be completed by the end of 2025.Location:Region of Kvemo Kartli , Rustavi.
Rustavi School N6
რუსთავის მე-6 საჯარო სკოლის რეაბილიტაციაProject name:Rehabilitation of Rustavi public school N6 Employer:The municipal fond of Georgia Description:Rustavi public school N6 is a comprehensive rehabilitation project in Kvemo kartli region , Rustavi. The school is dedicated to 800 pupil and employed 45 teacher. The total building area is 3,587.14 m2 , while green spaces have total area 8,986.96 m2. The project’s mission is to fully renovate the school aligned to modern standards including classrooms , multifunctional halls , sports grounds and dining places. In addition , electrical and mechanical systems will be upgraded and heating and fire safety systems will be added , outdoor areas will also be improved. The building will be fully adapted for disabled people with ramps , elevators and all necessary infrastructure. The project is being carried out by full compliance with current legislation , ensuring safe , comfortable and energy-efficient environment for both teachers and pupils. Our team is carrying out the project with high responsibility and professionalism.
The construction phase : Construction works actively going now. The project is scheduled to be completed in end of the 2025 year. Construction phase:Construction work is currently underway. The project is scheduled to be completed by the end of 2025.Location:Region of Kvemo Kartli , Rustavi.
Igoeti School
რუსთავის მე-6 საჯარო სკოლის რეაბილიტაციაProject name:Public school of Igoeti Employer:The municipal fond of Georgia Description:The public school of Igoeti is a two-story institute that is being built in Kaspi municipality, village Igoeti. The school is dedicated to 120 pupils and the total area is 6.494.00 m2. The building consists of classrooms, a multifunctional hall, dining place and sports stadiums and other infrastructures that are needed. The building is fully adaptable for disabled people, providing ramps and an elevator. The project is carried out by protective laws including safe work, fire safety systems and modern standards that provide a comfortable and safe place for children and teachers. The construction uses high-quality equipments that aligns the school with modern standards and provide educational spaces quality. Location:Village Igoeti , Kaspi municipality.
Igoeti School
რუსთავის მე-6 საჯარო სკოლის რეაბილიტაციაProject name:Public school of Igoeti Employer:The municipal fond of Georgia Description:The public school of Igoeti is a two-story institute that is being built in Kaspi municipality, village Igoeti. The school is dedicated to 120 pupils and the total area is 6.494.00 m2. The building consists of classrooms, a multifunctional hall, dining place and sports stadiums and other infrastructures that are needed. The building is fully adaptable for disabled people, providing ramps and an elevator. The project is carried out by protective laws including safe work, fire safety systems and modern standards that provide a comfortable and safe place for children and teachers. The construction uses high-quality equipments that aligns the school with modern standards and provide educational spaces quality. Location:Village Igoeti , Kaspi municipality.